How long is the design / build process?

For our standard designs we require 4-6 weeks to finalise the drawings and obtain Building Consent. The construction time would generally be between 16-26 weeks depending on the size of home. For bespoke designs, we would need to allow an extra 4-10 weeks for the design / engineering process.